1/CLEAR THE PLOTâ?¦..once you have chosen your plot clear the undergrowth and any over hanging tree limbs (p1-p10) 2/DIG THE PLOTâ?¦.. Now dig a hole the length of the plot and to a depth of the shovel blade. (14) 3/ TURN OVER SOILâ?¦..now turn over the newly exposed soil, making sure to remove any roots or stones (p15) 4/ADDâ?¦.. Add mushroom compost , pea straw ,chock and sheep poo ,water crystals and ash and mix it in well.(p18-p20)