ASSEMBLY

Lie all the stuff on its side on the floor.

Using the extraction chamber as an index, figure out how long everything needs to be to fit in the shortest space, with the condensor at the top, and the evaporator at the bottom. Lay it out with the top of the extraction chamber about 6" the low side coil outlet, and one barb of the expnasion chamber lid about 6" below that. Bring the high-side coil tube down to the other expansion chamber barb and cut it about 6" above the barb.

Cut the re-enforced hose to the proper lenghts to connect the pieces, add hose clamps, and connect it all up. You can heat the hose and/or use PAM cooking spray on the MALE ends of things to help get the hoses on.

TIGHTEN TIGHTEN TIGHTEN

Move on to "injection and testing"