...over 20 inches...so we did a pump test, it worked :thumbsup:, so...

1. It is important to de-burr all your PVC after you cut it, to provide a better seal when you glue system together...

2. Get all your manifold pcs. together and start assembly...

3. We dry-fitted pcs. together and 90'd over to test it out...

4. :smokin: Check out the round water mounds on the wall... ...
...............wwweeeeeeeee...........
I found this very motivating :dance: :dance: :dance:
latewood Reviewed by latewood on . The "Madman goes Aero" building thread I would like to request that you view, but, PLEASE DO NOT reply to this thread until I can finish Phaze1 tonight :) I would like to post all the build in real-time order before we start comments. Thanks, for all your cooperation ahead of time! :cool: I have been threatening to build a system. Well, I started tonight. I am going to build the 1st Phaze of a 3-4 Phaze system; that will be powered by a 600 gph 1/2 hp clear water pump.. I am tired of lugging water and nute solution around Rating: 5