I am go to build a simple system first, without the use of my 3x electronic manifold/timer...Don't worry I will be adding this later...So, I am going to do the first 2 tubs of a multiple tub system...these tubs are multi-funtional, i.e.
...we are building an aeroponic system, we could also use continual flow drip method, or by incorporating a cut-off valve; we convert system to dumpable DWC reservoirs :smokin:

After getting into the middle of putting this system together, I found the need for a few more parts. Converting this old bathroom into pumproom/water station, veg room, cloning station...That is another thread, but you will be seeing some things changing as we build system, the room awakens, and becomes functional...Enjoy :dance:

1. needed more parts, 2-3 valves, a drain conversion, and some gluable t's and endcaps...
2. Here, I threw it all in a box and "AWAY WE GO"...

3. Converting Old Bathroom...notice: drain system attached and tubs placed on wood frame support...
4. Drain system test...

5. Tubs hold water, drain seals work...
latewood Reviewed by latewood on . The "Madman goes Aero" building thread I would like to request that you view, but, PLEASE DO NOT reply to this thread until I can finish Phaze1 tonight :) I would like to post all the build in real-time order before we start comments. Thanks, for all your cooperation ahead of time! :cool: I have been threatening to build a system. Well, I started tonight. I am going to build the 1st Phaze of a 3-4 Phaze system; that will be powered by a 600 gph 1/2 hp clear water pump.. I am tired of lugging water and nute solution around Rating: 5