I am go to build a simple system first, without the use of my 3x electronic manifold/timer...Don't worry I will be adding this later...So, I am going to do the first 2 tubs of a multiple tub system...these tubs are multi-funtional, i.e.
...we are building an aeroponic system, we could also use continual flow drip method, or by incorporating a cut-off valve; we convert system to dumpable DWC reservoirs :smokin:

After getting into the middle of putting this system together, I found the need for a few more parts. Converting this old bathroom into pumproom/water station, veg room, cloning station...That is another thread, but you will be seeing some things changing as we build system, the room awakens, and becomes functional...Enjoy :dance:

1. needed more parts, 2-3 valves, a drain conversion, and some gluable t's and endcaps...
2. Here, I threw it all in a box and "AWAY WE GO"...

3. Converting Old Bathroom...notice: drain system attached and tubs placed on wood frame support...
4. Drain system test...

5. Tubs hold water, drain seals work...