Thank you for the reply rhizome ;]

unfortunately I don't know what a thruwall or a barbed fitting is... I'll explain my basic Idea for set up, someone PLEASE help me!!! Basically all i know is what a BUCKET is... I don't know bit names and tool names...

Okay..


So Rubbermaid 40gal Resevour... With BUCKETHEAD connector (Interior threads accept 3/4" standard pipe thread) On top, that hooks up to 3/4" Tubing to the pump? Yes?

Submersable Water Pump is the Resevour 3/4" Tubing Running from IT to the BUCKETHEAD?


PVC Pipe attaches to the OUTSIDE of the resevour? Correct? From there I would attach a T Connector PVC Peice?

I am planning on having SIX individual 5 gallon buckets that are connected to the Resevour.


Also THIS peice I don't know if I understand 100 percent.... Bulkhead Screen Ebb & Flow/Bulkhead Screen | Plumbing Materials & Fittings

says it accepts 3/4" (Which is PVC right?) So I could have the SIX pvc pipes running from the BULKHEAD, and Install SIX of these at the bottom of each bucket to connect the SIX pvc pipes? Or do I just use Tubing??? IM SO CONFUSED....


Input please i would love you forever.....:[[[[[
Illusion Reviewed by Illusion on . Beginning Hydroponics... Okay, I've seriously spent the past week doing nothing but research and feel pretty confident that I can take a stab at this. Done the soil thing in the past, ready to try this out. I apologize in advance if this post is very scattered, but that might directly reflect on my current psychological state ;] Decided to go with flow and drain style... Here's where the questions begin. Im doing six 5gallon buckets, individual flow to each with (im thinking) a 40 gallon rez Question Rating: 5